Patterson-Kelley Solutions Blog

Turning Up Turndown

[fa icon="calendar'] Dec 27, 2018 2:14:15 PM / by Patterson-Kelley posted in Boiler, Condensing Boilers, Hydronic Boilers, Condensing, aluminum boilers, commercial boilers, turndown, 10:1 turndown, low turndown, turndown ratios, high turndown, 5:1 turndown

[fa icon="comment"] 1 Comment

Commercial Boiler Efficiency

AdobeStock_40733858Placing system efficiency at the forefront of commercial boiler acquisition continues to be a trend in the heating and water heating industry. Manufacturers are racing ahead to push the limits of technology by offering aggressive turndown capabilities approaching, and even exceeding 20:1, at the detriment of system efficiency. 

Read More [fa icon="long-arrow-right"]

Breaking the Stigma on Aluminum Commercial Boilers

[fa icon="calendar'] Oct 24, 2018 4:42:00 PM / by Patterson-Kelley posted in Boiler, Condensing Boilers, Water Quality, Hydronic Boilers, Direct-fired, Condensing, aluminum boilers, commercial boilers

[fa icon="comment"] 10 Comments

IMG_1653

Changing the Perception of Aluminum Commercial Boilers

The commercial heating industry has faced an ongoing debate on the benefits of stainless steel heat exchangers versus aluminum heat exchangers. The process of choosing a new boiler has become confusing for both building owners and engineers. 

Read More [fa icon="long-arrow-right"]